A detailed breakdown of our 6-step engineering process, from shadow analysis to net-metering commissioning.

From Roof Inspection to Net-Metering in 6 Steps

We manage all aspects of your installation, ensuring safety, structural integrity, and regulatory TNEB compliance.

  1. Step 1: Rooftop Site Survey & 3D Shadow Profiling

    Our engineers map your roof coordinates and perform digital shadow profiling using solar tools to identify shading from trees, neighboring buildings, or water tanks.

  2. Step 2: Structural Integrity & Wind Load Design

    We engineer customized hot-dip galvanized (GI) structures rated to withstand coastal winds of up to 180 km/h, securing your concrete slabs without punctures or leakages.

  3. Step 3: Solar Electrical Drawing Approvals

    We generate detailed electrical schematics and register your application on the National Rooftop Solar Portal for TANGEDCO/TNEB feasibility approvals.

  4. Step 4: Mechanical & Electrical Commissioning

    Our certified electricians mount modules, run UV-resistant DC wiring, install AC/DC distribution boxes, test Surge Protection Devices (SPDs), and wire the grid-tie inverter.

  5. Step 5: TANGEDCO Inspection & Net-Metering Setup

    We liaison with the local TANGEDCO office for solar array inspection, net-metering programming, bidirectional meter installation, and commissioning.

  6. Step 6: Handover & Cloud Monitoring Portal Setup

    We walk you through system operation, safe shutdown procedures, and install smart mobile monitoring apps to track solar power generation in real-time.